Ur State Company, one of the Ministry of Industry and Minerals State Companies concluded a contract with Southern Power State Directorate to supply with (400) Km of suspended wires at a value of (1) billion and (324) million I.D.. Engineer Jaleel Muheisen Ali the company General Director clarified to MIM information bureau that this contract during last May, 2010 realized 85% performance rate referring that the achieved sales through the same period was (1) billion and (887)billion .D. while the accumulated sales for the same period was (7) billion and (410) million I.D.. The General Director added that the Nitrogen Unit and Wire Mill rolling machines were installed and operated in addition to supply equipments wires ferns as well as supply badaa with 2 high pressure pumps which enrich Ur State Company with industrial water. In a related context the company was provided with new machines to develop production lines within 2009 investment plan where vertical isolation machine for motors and transformers coiling wires were received up on which contracted with Specialized Institutions for Engineering Industries in addition to spare parts for horizontal polling and isolating machine and also (M30) pulling machine as well as the arrival of the second patch of telephone cable project which was contracted with Densent Austrian Company and also the company received control systems which was contracted with Al Hasnawi Company. It is to be noted that Ur State Company contracted with State and Private Sectors Companies to supply its products of suspended cables and wires for electric net works high tension wires and motors and transformers coiling wires and house wires and telephones cables in addition to producing aluminum plates and partitions for doors and windows.